ARCHITECT
NGP
BUILDING SURVEYORS
F3
CONTRACT MANAGER
Ross Renton
Brief
After taking the decision to refurbish their Spa destination, Sheraton Hotel asked M-PACT Group to complete the alterations and refurbishment of their Thermal Suite.
Site: 8 Conference Square, Edinburgh EH3 8AN
The objective was to provide their guests with a state-of-the-art relaxation experience. To begin, protective coverings were installed where appropriate prior to downtakings and the existing glass partition removed to allow works to take place. This was followed by the disposal of all existing coverings to floor, walls and ceiling leaving the bare canvas necessary to produce the final outcome.
Details
As the work was being completed in phases, the Sheraton One Spa would remain operational throughout. Although we had a degree of experience in the hotel industry, this was our first project within this specific environment. Fortunately, our understanding of working in a live environment stood us in good stead.
The project, completed within budget over a 20 week period, reinforced our ability to produce top quality work in high-end environments.
Design
Working closely with the client’s design team, we were tasked with producing a finished product which would be the pride of this 5* hotel group. The theme of pampered luxury was followed from design through materials selected to the quality of the installation workmanship.
Throughout the project we were able to provide assistance and advice with regard to the final outcome. As we were required to operate in other areas of the hotel to, for example, access distribution boards and mechanical controls, it was vital that we were able to communicate effectively and frequently with Hotel management.
The final outcome -an eye-catching spa with state-of-the-art finishes and equipment.